Controlled Blasting Technology for Tunnel Crossing Under High-speed …
"Due to a drainage problem, the Lanzhou to Chongqing high-speed rail line had been out of service during the 2015 wet season, so a drainage tunnel is to be constructed for the line and required to be accomplished before the 2016 wet season. This drainage tunnel is only 5 meters below the line which is in service, therefore blasting vibration needs to be strictly …